62
Assembly
5.3
Initialization
Only trained specialist staff may perform initial
initial set up
since initial commissioning of the
ebike
requires special tools and specialist
knowledge.
Experience has shown that a
n
ebike
which has
not yet been sold is automatically handed to
customers as soon as it appears ready to ride.
It makes sense to prepare each
ebike
so that
it
is fully ready for use immediately after being
assembled.
The assembly report (see
Section
11.2
)
describes all safety-relevant inspections, tests
and maintenance tasks.
All assembly work must be completed to
ensure the
ebike
is ready to ride.
Complete an assembly report to document
quality assurance (see Section 11.1).
5.3.1
Checking the battery
The battery must be checked before it is charged
for the first time.
Press the
On-Off button (battery)
.
If none of the LEDs on the battery level
indicator light up, the battery may be damaged.
The battery may be fully charged if at least one,
but not all, of the LEDs on the battery level
indicator is lit up.
Summary of Contents for BULLS 650-185
Page 211: ...210 Notes ...
Page 213: ...212 About these operating instructions ...
Page 215: ...214 About these operating instructions ...
Page 217: ...216 About these operating instructions ...
Page 219: ...218 About these operating instructions ...
Page 220: ...219 About these operating instructions ...
Page 221: ...220 About these operating instructions ...
Page 222: ...221 About these operating instructions ...
Page 223: ...222 About these operating instructions ...
Page 224: ...223 Documents 11 4 Charger operating instructions ABCDE ...
Page 225: ...224 Documents F 4A Charger DCG F H A I A J ...
Page 226: ...225 Documents F A I A J DCG F H ...
Page 227: ...226 Documents F DCG F H A I A J ...