12
STEP 5 INSTALL TOP CABLE
T1
T2
T5
T7
T3
T4
T6
T8
T9
T10
T12
T11
84
52
2
104
83
100
100
104
65
65
52
3
TOP CABLE (74)
Threaded End
Ball End
STEP2
STEP1
82
100
12
104
T5
T3
84
104
13
52
84
52
104
T4
T2
3
2
Fig. T1
Fig. T3,T5
Fig. T2,T4
Fig. T6
93
2
104
84
15
52
Fig. T10
84
84
104
52
52
104
2
T9
T11
Fig. T9,T11
Fig. T8
Fig. T12
Fig. T7
104
83
52
2