14
STEP 7 INSTALL LOWER CABLE
LOWER CABLE (76)
Ball End
Steel Ball End
L1
L4
L2
L3
L5
L6
84
104
52
Fig. L1
A3
52
104
84
14
Fig. L3
104
84
1
52
Fig. L2
Fig. L6
84
1
104
52
Fig. L4
9
83
65
65
52
100
100
104
Fig. L5
1. See Fig. L1 Route the steel ball end of the
LOWER CABLE (76)
under
Pulley L1
mounted at the front of the
Low Pull Station using one
3/8" X 1-3/4" HEX HEAD BOLT (84)
and one
3/8" NYLA-NUT (104)
.
2. See Fig. L2 Continue back to
Pulley L2
mounted on the
BASE FRAME (1)
using one
3/8" X 1-3/4" HEX HEAD
BOLT (84)
and one
3/8" NYLA-NUT (104)
.
3. See Fig. L3 Route the cable underneath
Pulley L2
and then up to
Pulley L3
mounted in bottom of the
DOUBLE
PULLEY BOLCK (14)
using one
3/8" X 1-3/4" HEX HEAD BOLT (84)
and one
3/8" NYLA-NUT
(104)
.
3. See Fig. L4 Continue down to
Pulley L4
mounted to the
BASE FRAME (1)
using one
3/8" X 1-3/4" HEX HEAD
BOLT (84)
and one
3/8" NYLA-NUT (104)
.
4. See Fig. L5 Route the cable underneath
Pulley L4
and
Pulley L5
mounted in the slot in the bottom of the
FRONT UPRIGHT (3)
using one
3/8" X 2-3/4" HEX HEAD BOLT (83)
, two
3/8" WASHERS (100)
, two
3/8" ID
FLANGE BUSHINGS (65)
, and one
3/8" NYLA-NUT (104)
.
5. See Fig. L6 Connect the steel ball end of the cable to the receptor bracket
L6
welded to the
LEG EXTENSION
ARM (9)
.