
Title: Final Test 8500
Document No: 129TP000
Sheet 4 of 17
BLEASE QUALITY DOCUMENT
BQD 083.V2
25/5/94
Checked:-________
5.0 TEST PROCEDURE
5.1 Test Equipment and Setup
ENSURE ALL TEST EQUIPMENT HAS A CURRENT CALIBRATION CERTIFICATE.
The following items will be needed to perform all the checks in this procedure:
•
Timeter Calibration Analyser RT-200 with following options fitted: RT-201 Control
Module, RT-202 Press Module, RT-203 Flow Module, or another Calibration Analyser.
The Timeter is supplied with its own pneumatic adapters for connection to hoses. See
section 6.0 for details of Calibration Analyser usage.
•
Hyperterminal should be set up as follows: 9600 baud, 1 start and stop bit, 8 data bits. No
handshaking is used. File should be saved as 8500.HT for further ref.
•
Electrical Safety Tester for earth leakage and continuity checks.
•
Stop Watch or other timepiece to measure up to 180 seconds.
•
5 ± 0.25 L compliance, 20 ± 1 L compliance, 50 ± 2.5 L compliance, 20 ± 2 cm H
2
O
resistance.
•
Miscellaneous air and oxygen supply hoses provided with the ventilator, a variable 60 psi
Air and/or Oxygen supply and a variable 0 to 20 L/m fresh gas source. Also a ventilator
patient hose and one short hose.
Equipment Setup
The pneumatic equipment listed above is connected as shown below for adult tests. Minor
alterations are done to this arrangement as the testing progresses. (All other Calibration
Analyser connections must be left open to atmosphere).