PRE-DELIVEY INSPECTION MADE BY BISON DEALERSHIP
Once the hammer mill has been adjusted completely, check and ensure that it is ready for proper
operation prior to deliver to customer. The following checklist is a reminder of checkpoints. Verify that
each point is satisfactory and recheck once all proper adjustments have been made.
Check that the hammer mill is properly assembled.
Check that bolts, nuts and screws are tight.
Check that the screws of the wheel maces are tightened properly.
Check that all grease fittings are lubricated.
Check that the assembly: expulsion elbow-cyclone is properly assembled.
Connect the PTO y check the rotor operation. Check that the machine doesn’t vibrate excessively
nor makes strange noises.
Clean the mill and retouch where the paint is peeled or scratched.
Ensure that all labels and protective covers are properly fixed without damages.
Ensure the machine has all features required by client.
Assembly Date______________Name and Signature of Technician_______________________
INSPECTION LIST
3
Summary of Contents for MMIB-20
Page 1: ...Models MMRB 20 MMIB 20 HAMMER MILL OPERATOR S MANUAL Part Number 4350 2130 01 MMB MMB...
Page 2: ......
Page 52: ...47...
Page 66: ...NOTES 61...
Page 67: ...NOTES 62...
Page 68: ...NOTES 63...
Page 69: ...NOTES 64...
Page 70: ...PART NUMBER 4350 2130 01 2012 Tecnomec Agr cola S A de C V All Rights Reserved...
Page 71: ......
Page 72: ......