INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Pellet burner Bisolid GP xx R tsc OM-BSGPRTSCV00/11/2016/EN
15
4. TUBE PELLET BURNER INITIALIZATION FOR OPERATION
4.1. PELLET BURNER CHECK-UPS BEFORE INITIALIZATION FOR
OPERATION
Before initializing the pellet burner for operation the servicing technician must check:
If the tube pellets burner series Bisolid GP xx R tsc is going to be installed on a solid
fuel hot water boiler.
If the installation, including the hot water boiler, complies with the project.
If the wood pellets correspond to standard EN ISO 17225-2:2014, classes A1, A2, B.
Electrical supply functionality and working order.
The service technician must train the consumer how to operate and manage
the pellet burner and also to fill in the exact start of operation date in the
warranty card of the product.
4.2. JOINT OPERATION OF TUBE PELLET BURNER AND SOLID
FUEL BOILER
The rotary tube pellet burner series Bisolid GP xx R tsc is allowed for installation only to hot
water boilers designed to use solid fuels. The possibility for parallel operation of solid fuel hot
water boiler with automated rotary tube pellet burner series Bisolid GP xx R tsc is based on
the fact that the burner manufacturer has performed multifunctional and precise tests and
measurements over the tube pellet burner operation with certain type of hot water boilers.
The rotary tube pellet burner’s series Bisolid GP xx R tsc can be mounted to
the hot water solid fuel boilers with sufficiently high efficiency.