Repair work at the humidifying and dehumidifying system
9.2.6 Reassembling the steam boiler
Assemble the steam bolier in reverse order.
Please observe the following instructions:
Check the capillary tube to correct resting on the heating elements and the correct fitting of the clamp.
Before installing the steam boiler cover place the o-ring carefully into the edge of the steam cylinder. To allow
a good fitting the o-ring must never protrude at the cylinder edge. The O-ring must be clean and undamaged
(replace if necessary).
Put the lid carefully on the steam cylinder.
The cover can now be pressed on the steam cylinder and screwed again.
Pull the insulation over the cable and put them back on the lid.
Make sure that the cable of capillary tube sensor is not unnecessarily bent and properly
conducted by the cover insulation.
Attach the clamping band over the insulation and pull it firmly.
Fix the steam hose with the double wire clamp.
It it must be ensured that the double wire clamp is recessed in the lid insulation.
A leaky steam hose can lead to moisture damage inside the device.
Close the stopcock or attach the intake hose of the hot water valve back into the original position.
Service Manual KBF (E5.2) 04-2015