Check-In Procedure
(for Big Ass
Fans Certified Installers Only)
Fan placement is to be in accordance with agreed upon original Scope of Work and Layout. If this is to change, please note
change and consult Field Service Manager for approval.
Installation techniques have been discussed (type of conduit, L-brackets if required, mounting technique explained). If the
extension tube exceed 4 ft (1.2 m), guy wires are explained and fully understood.
Times in/out, duration, and schedule presented and accepted.
Time (please list the number of employees and total duration of jobs):
Safety rules and regulations have been brought to installer’s attention (e.g., badges, safety harnesses, vests, hard hats,
footwear, lock out/tag out, certification processes, work area free of trash and debris, etc.). If there are any areas that are
forbidden or secure, they are brought to the supervisor’s attention and instructed not to enter. If there are any special site
conditions (i.e., open areas and operating machinery to be avoided), they are also brought to the supervisor’s attention and
instructed how to bypass the area if required.
Safety Rules and Regulations listed:
The facility manager understands all electrical requirements, i.e., breaker size, voltage, brand, main panel space, and they are
in accordance with original Scope of Work and Layout.
Additional comments:
Date:
Company:
Job Name:
Address:
Purchase Order No.:
City/State/ZIP:
Contact Name:
Phone:
E-mail:
**SEE THE FOLLOWING PAGE FOR NFPA 13 REGULATIONS**
2348 Innovation Drive
Lexington, KY 40511
Phone: 1-877-BIG-FANS
Fax: (859) 967-1695
www.big
ass
fans.com
ATTENTION: These items must be completed prior to any additional installation crew members entering jobsite or any
installation material being unloaded.
Summary of Contents for Pivot 180
Page 1: ...INSTALLATION GUIDE For help call 1 877 BIG FANS or visit www bigassfans com Pivot 180...
Page 46: ......
Page 48: ......
Page 50: ......
Page 59: ......