5
Transport and installation
5.1
Lifting and handling
IMPORTANT - Follow the instructions below.
1.
2.
3.
The machine is delivered from the Manufacturer on a pallet and
packed in a special cardboard box. Before unpacking, the machine
can be transported and handled by means of a lift truck with a
capacity of at least 250 kg.
To unpack the machine:
•
Remove the straps holding the cardboard box to the
pallet and remove the box.
•
After the machine has been unpacked, it must be lifted
by passing lifting straps through the two rear hooks
•
and the two front hooks.
5.2
Installation
IMPORTANT - Before proceeding with installation
read the following warnings carefully.
Failure to observe the following warnings could
cause injury, death or damage to equipment.
The model with petrol engine is delivered completely assembled, but
certain operations remain to be performed. The side brushes must
be mounted.
•
Remove the debris collection bin by rotating the bar with
the hook;
Once the bin is released, tilt it and remove it from its housing by
pulling on its wheels.
•
Tilt the machine until vertical;
straps
box
pallet
"operator present"
safety devices