Safety
2-7
2.5.3
Testing in keeping with the German Work-
place Safety Ordinance (BetrSichV)
In case of the coupling or installation of devices from vari-
ous manufacturers or suppliers, the operating company
has to carry out a precise test, prior to start-up, in keeping
with the German Workplace Safety Ordinance (BetrSichV)
in force and the applicable electrical regulations.
In case of queries, please get in touch with BFI Automa-
tion.
2.5.4
Safety test prior to initial operation
Danger of injury and material damage if improperly used!
Improper use of the compact flame controller can lead to
injury or even death and to material damage!
In order to ensure correct operation, the compact flame
controller must be tested several times for all applications
by starting and stopping the burner several times. In all
cases the flame relay must switch off reliably in case if the
flame is not detected. Carry out these tests whilst several
neighbouring burners are started and stopped and differ-
ent boiler outputs are used. This is an indispensable pre-
requisite for a safe and correct operation of the device!
Summary of Contents for CFC 100
Page 2: ......
Page 11: ...General aspects 1 7 1 8 Declaration of conformity ...
Page 20: ...Safety 2 8 ...
Page 24: ...Technical data 3 4 3 5 Block diagram CFC100 ...
Page 36: ...Transport Installation and Connection 4 12 ...
Page 40: ......
Page 42: ...Operation of the Compact Flame Controller 6 2 ...
Page 46: ...Failures 8 2 ...