5 Electric Installation
LB 470 Level
46
56925BA2 Rev. 03, 11/2017
4.
Open the terminal connection (Fig. 21, item 3) with an operating tool (slot-
ted screwdriver) and insert the stripped wire (min. 8 mm) (Fig. 21,item 4). The
terminal connection closes by pulling out the operating tool.
5.
The terminal connections are designed for wires (flexible) with a conductor
cross-section from 0.2 mm² to 2.5 mm² (with ferrule without plastic sleeve) or
0.2 mm² to 1.5 mm² (with ferrule with plastic sleeve). AWG = 24 – 12.
6.
Plug the network plug into the RJ45 socket (Fig. 21, item 9) (optional).
7.
Check the correct connection of the PE conductor (Fig. 21, item 10).
NOTICE
Note the specification relating to Protective earth and equipotential bonding
in chapter 5.1.4.
NOTICE
Only cable that is suitable for connection to the corresponding terminals may
be used. Detailed specifications can be found in the chapter 5.1.2 Cables and
Lines.
Summary of Contents for Duo Xpert
Page 2: ......
Page 4: ......
Page 119: ...LB 470 Level 7 Main Menu Device Setup 56925BA2 Rev 03 11 2017 119...
Page 181: ...LB 470 Level 12 Appendix 56925BA2 Rev 03 11 2017 181...
Page 184: ......
Page 190: ...1 A propos de ce manuel d utilisation LB 470 Niveau Level 8 56925BA59 Rev 01 11 2017...
Page 196: ...Level F llstand Technical Information Technische Information 56925TI1L Rev No 00 11 2017...
Page 227: ...Technical Information Level Technische Information F llstand 56925TI1L Rev 00 11 2017...