7
Machine Setup
Connecting the Machine
Before connecting the power supply, make sure that the volt-
age and frequency shown on the rating plate is conforming
with your mains power.
•
Place the machine on a stable table.
•
Connect the power line cord to the machine by insert-
ing the 2-hole plug into the mains plug socket.
•
Connect the power line plug to the wall outlet.
•
Turn on the power switch.
–
The sewing lamp will light up when the switch is
turned on.
Polarized plug information
This appliance has a polarized plug (one blade wider than the
other), to reduce the risk of electrical shock; this plug will fit in
a polarized outlet only one way. If the plug does not fit fully in
the outlet, reverse the plug. If it still does not fit, contact a
qualified electrician to install the proper outlet. Do not modify
the plug in any way.
Foot Control
With the sewing machine turned off, insert the foot control
plug into its connector on the sewing machine.
•
Turn on the sewing machine, and then slowly depress
the foot control to start sewing.
•
Release the foot control to stop the sewing machine.
A
tteNtioN
!
Always make sure that the machine is unplugged from
power source and the main switch is on «O». When the
machine is not in use and before inserting or removing parts.
Consult a qualified electrician if in doubt as how to connect
the machine to the power source. Unplug the power cord
when the machine is not in use.
A
tteNtioN
!