57
3-11
23
24
Option 2: Heater Power from Auxiliary
Batteries not Phoenix Unit
Run Heater Unit Power Cable to NITE
Batteries
Take the heater unit power cable, run it
under the truck (attach with zip ties where
necessary) over to the
NITE Batteries
. Strip
back outer cover to expose two inner wires.
Attach Connectors
Strip end off brown wire. Before stripping
red wire, put the housing of the fuse holder
on, and pull the red wire through. Now strip
the end of the red wire, attach terminal and
crimp. Pull red wire back into fuse holder.
Push rubber seal into place. Attach ring
terminal to ground wire and crimp.
Attach Wires to NITE Batteries
Connect auxiliary heater ground wire to
ground terminal threaded stud of Battery
Management System. Connect heater unit
positive wire to positive terminal of
NITE
Batteries
. Insert 20 amp fuse into fuse
holder. Tighten all connections.
YOU CAN NOW RECONNECT THE
TRUCK’S BATTERIES TO TEST THE
SYSTEM.
25
Espar Heater Install
Summary of Contents for NITE Phoenix T2000
Page 8: ...8 1 6 Before You Start EPA ...
Page 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Page 24: ...24 Section 2 Electrical Installation ...
Page 42: ...42 2 18 Electrical Installation ...
Page 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Page 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Page 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Page 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Page 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Page 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Page 65: ...65 Section 5 Operating Instructions ...
Page 69: ...69 Section 6 Battery Management System BMS Installation ...
Page 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Page 71: ...71 6 2 Battery Management ...
Page 72: ...72 6 3 Battery Management ...