48
3-2
3
4
A
Espar Heater Install
Drill Outlet Hole for Heat Unit
Mark the
floor of the truck
using the 5
small holes of the mounting plate. Remove
mounting plate, place a 4 ¼″ hole saw over
the middle of the floor marks, and drill the
outlet hole for the heater, intake, exhaust
and pickup tube. Also drill a 1/2″ hole
approximately 1 to 2″ from mounting plate
corner.
NOTE: DO NOT USE PHOENIX DUCT
FOR HEATER VENT
Install Sleeper Heat Vent
Select location for the vent in the lower left
side of the center support wall closest to
heater. Drill a 2 ½″ hole (A) to allow
distribution of heat into the sleeper. After
hole is drilled, use self- tapping screws to
attach heat port. Now snap louver into
place.
Summary of Contents for NITE Phoenix T2000
Page 8: ...8 1 6 Before You Start EPA ...
Page 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Page 24: ...24 Section 2 Electrical Installation ...
Page 42: ...42 2 18 Electrical Installation ...
Page 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Page 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Page 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Page 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Page 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Page 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Page 65: ...65 Section 5 Operating Instructions ...
Page 69: ...69 Section 6 Battery Management System BMS Installation ...
Page 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Page 71: ...71 6 2 Battery Management ...
Page 72: ...72 6 3 Battery Management ...