![Bergstrom NITE Phoenix T2000 Installation Manual Download Page 21](http://html1.mh-extra.com/html/bergstrom/nite-phoenix-t2000/nite-phoenix-t2000_installation-manual_2737091021.webp)
21
1-19
Installation Procedures
Attach Assembled Elbows to the
Flexible Duct
Measure and cut desired length of flex duct.
Insert flexible duct onto the round end of
the elbow units and secure with the
provided 4″ hose clamps.
Mounting Phoenix Controller to OE
Control Panel
For this application, we chose to relocate
the factory installed Espar heater controller.
It was raised allowing enough room for the
Phoenix controller to mount below the
heater control. Mounting location can be
changed but always check the harness
length before cutting. For applications with
no factory installed heater see instructions
page 20.
Remove OE Control Panel
Disconnect all OE wires and cables form
the control panel and remove.
32
33
34
Summary of Contents for NITE Phoenix T2000
Page 8: ...8 1 6 Before You Start EPA ...
Page 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Page 24: ...24 Section 2 Electrical Installation ...
Page 42: ...42 2 18 Electrical Installation ...
Page 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Page 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Page 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Page 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Page 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Page 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Page 65: ...65 Section 5 Operating Instructions ...
Page 69: ...69 Section 6 Battery Management System BMS Installation ...
Page 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Page 71: ...71 6 2 Battery Management ...
Page 72: ...72 6 3 Battery Management ...