39
2-15
24
25
A
B
Electrical Installation
Run Cables from Truck Batteries
Loom 2 full length battery cables, 1 red and
1 black. The red (positive) cable will
connect the truck starting batteries positive
post to the (start) post (A) of the battery
separator.
You must use the provided 90
degree battery terminal end at the Terra
Power separator rotated to the center of
the switch.
Torque specs for separator terminals 88
(recommended) to 132 (maximum) inch
lbs.
The black (negative) will connect the truck
(negative) to the threaded stud (D) of the
BMS.
Connect NITE Batteries to the Battery
Separator
Using red battery cable, measure and cut to
proper length. Crimp ring terminals and
heat shrink. Connect one end to the most
appropriate positive (+) terminal of the
NITE
Batteries.
Connect the other end to the
AUXILIARY terminal (B) of the battery
separator. See top photo.
You must use
the provided 90 degree battery terminal
end at the separator rotated to the
center of the switch
Install the Separator Assembly
Torque the Battery Cable Connections
Install the cover assembly on the enclosure.
D
26
27
Summary of Contents for NITE Phoenix T2000
Page 8: ...8 1 6 Before You Start EPA ...
Page 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Page 24: ...24 Section 2 Electrical Installation ...
Page 42: ...42 2 18 Electrical Installation ...
Page 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Page 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Page 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Page 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Page 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Page 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Page 65: ...65 Section 5 Operating Instructions ...
Page 69: ...69 Section 6 Battery Management System BMS Installation ...
Page 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Page 71: ...71 6 2 Battery Management ...
Page 72: ...72 6 3 Battery Management ...