13. Disassembly
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• e.g. adjustable spanner
Always to be worn:
Preparatory tasks
1.
Depressurise the compressed gas system or the respective system section and secure it against unintentional
pressure build-up.
2.
Decommissioning has been completed.
Illustration
Description / explanation
D
E
3. Close and disassemble the feed line
[E]
.
F
G
H
4. Disassemble the discharge line
[F]
.
BEKOMAT
®
16 CO
Original installation and operation manual
50 | 60
Summary of Contents for BEKOMAT 16 CO
Page 1: ...EN BEKOMAT 16 CO 01 3582 Original installation and operation manual BM16CO ...
Page 55: ...Original installation and operation manual BEKOMAT 16 CO 55 60 ...
Page 58: ...BEKOMAT 16 CO Original installation and operation manual 58 60 ...
Page 59: ...Original installation and operation manual BEKOMAT 16 CO 59 60 ...