10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Prerequisites
Tools
Material
Protective equipment
• Screwdrivers:
cross-head size 2.5 mm (0.09")
• e.g. adjustable spanner
• Hexagon socket key size 4
• Cleaning brush made of wire or soft
plastic material with
Ø max. = 1.5 mm (0.05")
Ø max. = 2.5 mm (0.09")
• Sealants
• Lubricant for greasing the O-rings
• Mild detergent
• Cotton cloth or disposable tissue
Always to be worn:
Preparatory tasks
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
Description / explanation
2
2. Loosen the 4 pan-head screws
[2]
.
14
10
13
3
3. Raise the top cover
[3]
and lift the cable
terminals
[10, 13, 14]
off.
BEKOMAT
®
16 CO
Original installation and operation manual
36 | 60
Summary of Contents for BEKOMAT 16 CO
Page 1: ...EN BEKOMAT 16 CO 01 3582 Original installation and operation manual BM16CO ...
Page 55: ...Original installation and operation manual BEKOMAT 16 CO 55 60 ...
Page 58: ...BEKOMAT 16 CO Original installation and operation manual 58 60 ...
Page 59: ...Original installation and operation manual BEKOMAT 16 CO 59 60 ...