Commissioning
EL34xx
84
Version: 1.5
Fig. 73: Sample program with variables after a compile process (without variable integration)
The control program is now created as a project folder, followed by the compile process:
Fig. 74: Start program compilation
The following variables, identified in the ST/ PLC program with "AT%", are then available in under
"Assignments" in the project folder explorer:
Assigning variables
Via the menu of an instance - variables in the "PLC” context, use the "Modify Link…" option to open a
window for selecting a suitable process object (PDO) for linking:
Summary of Contents for EL34 Series
Page 2: ......
Page 52: ...Mounting and wiring EL34xx 52 Version 1 5 Fig 35 Other installation positions ...
Page 58: ...Mounting and wiring EL34xx 58 Version 1 5 EL3453 LEDs and connection Fig 40 EL3453 LED s ...
Page 92: ...Commissioning EL34xx 92 Version 1 5 Fig 86 Incorrect driver settings for the Ethernet port ...
Page 130: ...Commissioning EL34xx 130 Version 1 5 Fig 147 Process Data tab SM3 EL3443 ...
Page 131: ...Commissioning EL34xx 131 Version 1 5 Fig 148 Process Data tab SM3 EL3453 ...
Page 132: ...Commissioning EL34xx 132 Version 1 5 Fig 149 Process Data tab SM3 EL3483 ...
Page 160: ...Commissioning EL34xx 160 Version 1 5 Index F802 PMX Guard Settings ...
Page 183: ...Commissioning EL34xx 183 Version 1 5 Index F802 PMX Guard Settings ...
Page 205: ...Commissioning EL34xx 205 Version 1 5 Index 1C13 TxPDO assign ...
Page 214: ...Commissioning EL34xx 214 Version 1 5 Index F802 PMX Guard Settings ...
Page 242: ...Commissioning EL34xx 242 Version 1 5 Index 1C13 TxPDO assign ...
Page 259: ...Application examples EL34xx 259 Version 1 5 7 Application examples ...