Commissioning
EL34xx
72
Version: 1.5
Select the PLC configuration "PLC_example.tpy" in the browser window that opens. The project including the
two variables identified with "AT" are then integrated in the configuration tree of the System Manager:
Fig. 54: PLC project integrated in the PLC configuration of the System Manager
The two variables "bEL1004_Ch4" and "nEL2008_value" can now be assigned to certain process objects of
the I/O configuration.
Assigning variables
Open a window for selecting a suitable process object (PDO) via the context menu of a variable of the
integrated project "PLC_example" and via "Modify Link..." "Standard":
Fig. 55: Creating the links between PLC variables and process objects
In the window that opens, the process object for the variable “bEL1004_Ch4” of type BOOL can be selected
from the PLC configuration tree:
Summary of Contents for EL34 Series
Page 2: ......
Page 52: ...Mounting and wiring EL34xx 52 Version 1 5 Fig 35 Other installation positions ...
Page 58: ...Mounting and wiring EL34xx 58 Version 1 5 EL3453 LEDs and connection Fig 40 EL3453 LED s ...
Page 92: ...Commissioning EL34xx 92 Version 1 5 Fig 86 Incorrect driver settings for the Ethernet port ...
Page 130: ...Commissioning EL34xx 130 Version 1 5 Fig 147 Process Data tab SM3 EL3443 ...
Page 131: ...Commissioning EL34xx 131 Version 1 5 Fig 148 Process Data tab SM3 EL3453 ...
Page 132: ...Commissioning EL34xx 132 Version 1 5 Fig 149 Process Data tab SM3 EL3483 ...
Page 160: ...Commissioning EL34xx 160 Version 1 5 Index F802 PMX Guard Settings ...
Page 183: ...Commissioning EL34xx 183 Version 1 5 Index F802 PMX Guard Settings ...
Page 205: ...Commissioning EL34xx 205 Version 1 5 Index 1C13 TxPDO assign ...
Page 214: ...Commissioning EL34xx 214 Version 1 5 Index F802 PMX Guard Settings ...
Page 242: ...Commissioning EL34xx 242 Version 1 5 Index 1C13 TxPDO assign ...
Page 259: ...Application examples EL34xx 259 Version 1 5 7 Application examples ...