![Baxi CBP Matic 18 Manual Download Page 212](http://html.mh-extra.com/html/baxi/cbp-matic-18/cbp-matic-18_manual_2711698212.webp)
49
a)
b)
Figure 29
– Installing the sensor level in the storage unit
2
– Then, you should install the ramp to drop the pellets in the boiler’s internal tank.
For this, you should start by removing the right side cov
er of the boiler’s tank –
removing the 4 screw securing it (Figura 30).
Figure 30
– Removing the lateral cover of the boiler’s tank
3
– To assemble the ramp to drop the pellets you should insert it in the tank, as
shown in the following pictures, and fasten it with the screws previously removed.
a)
b)
Summary of Contents for CBP Matic 18
Page 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Page 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Page 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Page 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Page 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Page 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Page 231: ...68 c b c d e f ...
Page 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 245: ...82 ...
Page 246: ...83 ...
Page 247: ...84 ...
Page 248: ......
Page 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...