![Baxi CBP Matic 18 Manual Download Page 167](http://html.mh-extra.com/html/baxi/cbp-matic-18/cbp-matic-18_manual_2711698167.webp)
4
All the unit's components guarantee its operation and energy efficiency and should
only be replaced with original parts provided by an authorised technical assistance
centre
The unit must be serviced at least once a year by the installation engineer.
This manual is provided with the product. Please keep it beside the unit.
For your safety, we recommend that:
You fully read and understand the information detailed in this manual before
handling the pellet-run boiler, which is a biomass heating unit.
You make sure the hydraulic circuit was correctly assembled and connected to
the water supply before turning on the pellet-run boiler.
The boiler is not intended for use by children or persons with limited physical,
sensory or mental capabilities, nor by those lacking experience and knowledge,
unless under direct supervision or instruction.
Do not touch the boiler when barefoot, nor when any part of your body is wet or
humid.
Do not tamper with safety or adjustment features without the manufacturer's
authorization;
Do not cover or reduce the size of the vents at the installation area;
The pellet-run boiler requires good air supply to guarantee correct combustion; as
such, if the unit is kept in an air tight environment or is exposed to other existing
sources of air extraction, its correct functioning may be impeded.
The existence of vents is a requisite for proper combustion;
Do not leave the packing materials near children;
When the unit is operating normally, the boiler door cannot be opened.
Avoid direct contact with parts of the unit that tend to become hot during
operation;
Check the existence of any obstructions on the fume duct before turning on the
unit after a long period of inactivity;
This pellet-run boiler is intended for residential use, within a protected
environment. Safety systems may intervene to shut down the boiler. If this occurs,
Summary of Contents for CBP Matic 18
Page 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Page 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Page 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Page 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Page 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Page 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Page 231: ...68 c b c d e f ...
Page 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 245: ...82 ...
Page 246: ...83 ...
Page 247: ...84 ...
Page 248: ......
Page 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...