3.1
Installation requirements
The minimum distance required between the pellet-run boiler and any highly
flammable surfaces is found specified in 4.
The top of the boiler must be at a distance of at least 100 cms from the ceiling,
especially in rooms with ceilings composed of flammable materials.
The base supporting the boiler cannot be of flammable material. As such, adequate
protection should always be used.
a)
b)
Figure 4
– Minimum distances from all surfaces: a) upper view of the unit's
installation; b) side view of the unit's installation
Warning!
Keep combustible and flammable materials at a safe distance.
Summary of Contents for CBP Matic 18
Page 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Page 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Page 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Page 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Page 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Page 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Page 231: ...68 c b c d e f ...
Page 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 245: ...82 ...
Page 246: ...83 ...
Page 247: ...84 ...
Page 248: ......
Page 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...