![Baumer PF55S Operation Manual Download Page 41](http://html1.mh-extra.com/html/baumer/pf55s/pf55s_operation-manual_2710827041.webp)
6
Commissioning
In certain countries and regions, inspections are carried
out or authorization obtained before commissioning the
equipment.
The flow sensor can only be operated as a component within an
pipeline system. Observe the operating company’s specifications
and the settings for the overall system, as well as all safety infor-
mation and descriptions within this manual, during commissioning.
n
The flow sensor must be installed.
n
The flow sensor must be electrically connected.
5.4 “Electrical connection” on page 38
Before commissioning, all system parameters must be set:
n
The flow sensor is connected to a PC via the USB port.
6.1 “Create USB interface” on page 41
n
The BCP software is installed on the PC with all drivers.
6.2 “BCP software installation” on page 42
6.1 Create USB interface
Personnel:
n
Operator
Protective equipment:
n
Protective work clothing
n
Safety boots
DANGER!
Risk of injury when entering the operating space of
the super-ordinate machine and its moving parts
The flow sensor must be connected to a PC via the USB port in
order to install the BCP software with all drivers.
Commissioning
Create USB interface
05.03.2020
Flow sensor PF55S
41