POLARIS PROFESSIONAL
- for Zone 1/21
POLARIS Panel PC Professional 15" up to 24"
Operation
Technical data subject to change.
04/2019
EN 55/68
8.3.5
Restoration in the work state
With confirming the function with all matching background processes is begun immediately
or without following security queries.
ATTENTION
With starting the restoration of the operating system in the work state all data on
the operating system partition get lost!
Contents and format of all other partitions on the hard disk are preserved
consistently.
In the upper area of the window the inscription of the well-chosen function is indicated. In
the next line – the inscription of the already running background process. Should a process
be computable, the proportional issue appears in the next line how far the process is already
concluded. As a rule all time-luxurious processes are computable. The progress beam in
the middle of the window returns the graphic picture of the percent value. For the processes
without percent issue the progress beam is indicated in the uncertain form.
ATTENTION
All background processes are automated completely, therefore no intervention
is necessary. In addition, some background processes run in s. g. Single fashion
or they are sensitive to the other parallel processes and to Interrupts of external
periphery devices!
To avoid the interruptions of all kind, should take place during the process no
keyboard input, mouse, track ball-Clicks as well as no touching of the screen.
The Recovery begins with verifying (Calculate and comparisons of the test sum) to the
available effigy file.
Illustration 17:
Verify to the effigy file
After the successful check, the formatting of the operating system partition is begun.