BH8-Series – User’s Manual
www.barrett.com
© 2007 Barrett Technology®, Inc.
Document: D3000, Version: AF.00
Page 16 of 82
3.3 Electrical Connections
•
Place the Power Supply on a flat, secure surface anywhere between the base of the robot and
the host PC (or robot controller).
•
With your PC off, attach the serial cable from your 9-pin COM Port to the Power Supply.
Barrett Technology supplies a 3-meter standard straight-through serial cable, but you may
purchase a longer cable if desired.
•
Attach the Power Supply Line Cord into any convenient outlet and verify that it is switched
OFF.
•
Attach the 15-pin end of the Hand Cable to the Power Supply and the other end into the Hand.
Tighten the strain-relief screws using the Phillips screwdriver provided in the toolkit.
3.4 Host Computer
The BH8-SERIES Control Software was written for computers running Windows
95/98/NT4.0/2000. Barrett Technology recommends using a Pentium based processor with a
minimum CPU clock speed of 266 MHz and 32 Mbytes of RAM. The software requires 10
Mbytes of free disk space. Communications requires one available 9-pin serial port.
3.5 Installing BH8-SERIES Control Software
The BH8-SERIES Control Software consists of the BHControl Interface, firmware, and example
programs. The BHControl Interface is a graphical Windows interface that allows you to control
the BarrettHand™ quickly and easily. The BHControl Interface can be used to test Supervisory
and RealTime control sequences, determine communication loop rates, demonstrate functionality,
help you learn how to independently write C code, and automatically generate C code based on
tested algorithms
1
. Run the setup.exe program on the CD-ROM to install all necessary files for
using the BHControl Interface, the most recent version of firmware, online manuals, and example
programs.
3.6 Power-Up Sequence
Once the previous steps are complete, your BH8-SERIES System is ready for use. Power up the
system according to the instructions below:
1.
Verify the serial cable is plugged into the desired communications port and into the 9-pin
connector on the back of the Power Supply.
2.
Verify the BarrettHand™ Cable is plugged into the 15-pin connector on the back of the Power
Supply and into the bottom of the BarrettHand™.
3.
Verify the AC line Line Cord cord is plugged into a valid power source (see Appendix A) and
into the power outlet on the back of the Power Supply.
4.
Turn on the host computer.
5.
Turn on the Power Supply. The main power switch is located on the back panel.
6.
The BarrettHand™ is now ready for operation.
1
The code generated by the Control Interface requires the C-Function Library to compile.