R5906788-03
Thor series
50
Hoses IN/OUT connection scheme
The labels on the projector and on the chiller indicating the three different cooling circuits: (
R/B
,
G
and
DMD
)
and the direction of the liquid flow:
OUT
and
IN
. 'OUT' means liquid flows out of the chiller or projector, 'IN'
means liquid flows into the chiller or projector. Both sides of all hoses are also labeled.
Chiller without DMD cooling
unit
(not for Thor)
Chiller with DMD cooling unit
Projector
DMD OUT
DMD IN
DMD IN
DMD OUT
R/B OUT
R/B IN
G OUT
G IN
G IN
G OUT
R/B IN
R/B OUT
The Thor series projector requires only one chiller. The circuits G-IN and G-OUT are omitted.
How to connect the hoses?
1.
Ensure that all connectors of the hoses, chillers and projector are clean. Wipe away any dust before attaching.
2.
Connect the hoses one by one with the chiller and projector as illustrated below. (see also 'IN/OUT connection
scheme' above)
G OUT
G OUT
G IN
DMD OUT
DMD OUT
DMD IN
DMD IN
R/B OUT
R/B OUT
R/B IN
R/B IN
R
/B
O
U
T
G
O
U
T
R
/B
I
N
D
M
D
O
U
T
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
D
M
D
I
N
G
I
N
G
I
N
Image 6-7
Note:
The circuit is pressurized which makes it sometimes difficult to insert the hoses.
Tip:
First move the latch (reference 1 Image 6-8) away from the connection while coupling the hose.
Then release the latch and push the hose further until the latch locks.
1
1
Image 6-8: Left: Male hose connection, right: Female hose connection
Summary of Contents for Thor Series
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Thor series...
Page 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com...
Page 8: ...R5906788 03 Thor series 8...
Page 24: ...R5906788 03 Thor series 24 Safety Information...
Page 26: ...R5906788 03 Thor series 26 Commander Web Commander System overview...
Page 44: ...R5906788 03 Thor series 44 Installation process...
Page 68: ...R5906788 03 Thor series 68 Lenses Lens selection...
Page 78: ...R5906788 03 Thor series 78 Installing a HDD into the ICMP ICMP...
Page 110: ...R5906788 03 Thor series 110 Starting up...
Page 122: ...R5906788 03 Thor series 122 Scheimpflug...
Page 130: ...R5906788 03 Thor series 130 Convergence...
Page 142: ...R5906788 03 Thor series 142 Preventative maintenance actions...
Page 160: ...R5906788 03 Thor series 160 Specifications...
Page 168: ...R5906788 03 Thor series 168 Pin configurations...
Page 172: ...R5906788 03 Thor series 172 Environmental information...
Page 176: ...Glossary R5906788 03 Thor series 176...
Page 181: ...R5906788 03 Thor series 181...
Page 182: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906788 03 07 09 2018...