R5906788-03
Thor series
109
Light button is white. The projector status light is continuous green (in normal condition, no errors and no
warnings). The laser status light remains off.
In PRECONDITIONED mode the chillers are operational and the heat dissipation of the DMDs is under
control. Heat dissipated by the active formatter boards is removed. Ingesting of content, creating playlist, etc.
is already possible on the ICMP. Also the creation of macros etc. is possible if that is feasible without
projecting an image (lasers are not active).
Stage 6 :
Projector is
Operational
and in
CONDITIONING
mode. This process starts as soon as the Light
button is pressed for 3 seconds (reference C Image 10-1). The laser status light on the top of the projector
flashes a few times and then lights up continuously white. The sealed compartments are cooling down from
ambient to operating temperature and humidity is extracted. The conditioning process takes approximately 3
to 15 minutes (depends on the environmental conditions). Following sub-stages take place during
CONDITIONING:
Stage 6.1 :
Checking ambient and internal conditions.
Stage 6.2 :
Turning pump on. Reaching liquid flow target.
Stage 6.3 :
Flow target reached. Conditioning humidity in the projector.
Stage 6.4 :
Cooling started.
Stage 6.5 :
Reaching liquid temperature target.
During CONDITIONING the backlight of the Light button is blinking green. The projector status light is
continuous green (in normal condition, no errors and no warnings).
Stage 7 :
Projector is
Operational
and
CONDITIONED
. Temperature and humidity inside the sealed
compartments are within specifications and the lasers are activated. Image is projected on the screen in case
the dowser is open and a source or test pattern is selected. The projector status light is continuous green (in
normal condition, no errors and no warnings) and the laser status light on the top of the projector lights up
continuously white.
Stage 8 :
Projector is in
Operational
and in
DECONDITIONING
mode. This process starts as soon as the
Standby button or Light button is pressed for 3 seconds (reference D Image 10-1) while the projector is in
conditioning or conditioned mode. The DECONDITIONING mode brings the system back to the
PRECONDITIONED state. The laser status light on the top of the projector remains lighting up white. The
sealed compartments are brought back to ambient temperature and humidity extraction is stopped. The
deconditioning process takes a few minutes and during this process the backlight of the Light button is blinking
white. The projector status light is continuous green (in normal condition, no errors and no warnings).
Summary of Contents for Thor Series
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Thor series...
Page 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com...
Page 8: ...R5906788 03 Thor series 8...
Page 24: ...R5906788 03 Thor series 24 Safety Information...
Page 26: ...R5906788 03 Thor series 26 Commander Web Commander System overview...
Page 44: ...R5906788 03 Thor series 44 Installation process...
Page 68: ...R5906788 03 Thor series 68 Lenses Lens selection...
Page 78: ...R5906788 03 Thor series 78 Installing a HDD into the ICMP ICMP...
Page 110: ...R5906788 03 Thor series 110 Starting up...
Page 122: ...R5906788 03 Thor series 122 Scheimpflug...
Page 130: ...R5906788 03 Thor series 130 Convergence...
Page 142: ...R5906788 03 Thor series 142 Preventative maintenance actions...
Page 160: ...R5906788 03 Thor series 160 Specifications...
Page 168: ...R5906788 03 Thor series 168 Pin configurations...
Page 172: ...R5906788 03 Thor series 172 Environmental information...
Page 176: ...Glossary R5906788 03 Thor series 176...
Page 181: ...R5906788 03 Thor series 181...
Page 182: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906788 03 07 09 2018...