R5906788-03
Thor series
140
14.1 1 month maintenance actions
MAINTENANCE TYPE A (perform every month)
The 1 month maintenance actions, listed below, may be performed by a trained projectionist who is
familiar with potential hazards associated with the product.
N-
o.
Maintenance action
Remarks
1
Check
dust
filters
of the projector for
dust
and
grease
.
Grease on the filter can build up after several months in an
environment contaminated with greasy air. Note that areas where
popcorn is consumed are subject to greasy air.
•
If the filters are contaminated with
dust
than cleaning the filters
with a
vacuum cleaner
should be sufficient.
•
In case the filters feel
greasy
than the filters must be
washed
.
Take into account that the time needed to dry the dust filters may
be 24 hours or more. For that, it's recommended to have a second
set of dust filters which can be used while cleaning the first set.
Replace damaged filters
immediately.
See procedures
”
, page
145, and
”
To speed-up drying, allow the
filter(s) to dry at 50°C max in a
well ventilated room.
2
Check the surface of the lens output side for dust. (it is not needed
to remove the lens from the projector). Only clean if necessary.
Clean the lens output side in case
dust is clearly visible upon the
surface.
Note:
if the lens was removed
from the projector, a manual
“
Lens Home & Return
”
action
must be executed to calibrate the
position of the lens in relation to
the Lens Holder. This way the
references of the existing 'lens
files' remain valid. See user guide
of the Communicator software.
3
Check the porthole (both sides) for dust.
Clean the porthole in case dust is
clearly visible upon the surface.
Use an optical cloth.
4
Check the good working condition of the external safety interlock
system (if installed).
Ensure that all safety signs are
still in place. .
5
Check
dust
filters
of the chillers for
dust
and
grease
.
To access the filters and cleaning
instructions see documentation
set of the chillers.
14.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is
familiar with potential hazards associated with the product.
Summary of Contents for Thor Series
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Thor series...
Page 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com...
Page 8: ...R5906788 03 Thor series 8...
Page 24: ...R5906788 03 Thor series 24 Safety Information...
Page 26: ...R5906788 03 Thor series 26 Commander Web Commander System overview...
Page 44: ...R5906788 03 Thor series 44 Installation process...
Page 68: ...R5906788 03 Thor series 68 Lenses Lens selection...
Page 78: ...R5906788 03 Thor series 78 Installing a HDD into the ICMP ICMP...
Page 110: ...R5906788 03 Thor series 110 Starting up...
Page 122: ...R5906788 03 Thor series 122 Scheimpflug...
Page 130: ...R5906788 03 Thor series 130 Convergence...
Page 142: ...R5906788 03 Thor series 142 Preventative maintenance actions...
Page 160: ...R5906788 03 Thor series 160 Specifications...
Page 168: ...R5906788 03 Thor series 168 Pin configurations...
Page 172: ...R5906788 03 Thor series 172 Environmental information...
Page 176: ...Glossary R5906788 03 Thor series 176...
Page 181: ...R5906788 03 Thor series 181...
Page 182: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906788 03 07 09 2018...