![background image](http://html1.mh-extra.com/html/barco/sp2k-s/sp2k-s_installation-manual_4254171046.webp)
R5913197 /02 SP2K-S
46
4.4 Connecting a UPS with the projector
electronics
WARNING:
Only use UPS units which are suitable for the SP2K-S series projector. See chapter
Installation requirements
, for more information about the requirements of the UPS.
CAUTION:
The electrical connection with the UPS INLET socket of the projector must be done with
a certified AC power supply cord (minimum 0.75 mm² or 18 AWG and minimum 300V)
The projector is configured by default for use without UPS.
Required tools
•
Torx screwdriver T20
•
Flat screwdriver
•
Open-end wrench 24 mm
Required parts
Certified AC power supply cord 1.5 mm², 14 AWG, min 300 V
How to connect a UPS unit with the projector electronics?
1.
Make sure the net input cover has been removed. For more info, see
“Accessing the power connections”,
.
2.
The link (two wires) between J4 and J3 connectors must be replaced by a link between J4 and J5 in order
to configure the projector for use with UPS.
Summary of Contents for SP2K-S
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K S...
Page 4: ......
Page 8: ...R5913197 02 SP2K S 8...
Page 22: ...R5913197 02 SP2K S 22 Safety...
Page 64: ...R5913197 02 SP2K S 64 Lenses Lens holder...
Page 72: ...R5913197 02 SP2K S 72 ICMP X...
Page 92: ...R5913197 02 SP2K S 92 ICMP X...
Page 100: ...R5913197 02 SP2K S 100 Projector Power Cycle...
Page 106: ...R5913197 02 SP2K S 106 Connectivity...
Page 112: ...R5913197 02 SP2K S 112 1 Image 10 7 Sealed cover fixation Convergence...
Page 120: ...R5913197 02 SP2K S 120 Convergence...
Page 130: ...R5913197 02 SP2K S 130 3 Lift up the cover and remove it reference 2 Projector covers...
Page 144: ...R5913197 02 SP2K S 144 Projector covers...
Page 152: ...R5913197 02 SP2K S 152 List of tools...
Page 156: ...R5913197 02 SP2K S 156 Index...
Page 157: ......