47
R5913197 /02 SP2K-S
2
2
J4
J3
J5
J4
J3
J5
Image 4–7
3.
Guide the AC power cord (reference 1) through the cable gland (reference 2). Connect the wires
(references 4 and 5) to the 3–terminal strip (reference 3) dedicated to UPS as illustrated. Use a torque
screwdriver to fasten the screws of the 3-terminal strip with a torque of 0.5 Nm.
Warning:
Always connect the PE wire (reference 4) first, then the other wires.
Summary of Contents for SP2K-S
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K S...
Page 4: ......
Page 8: ...R5913197 02 SP2K S 8...
Page 22: ...R5913197 02 SP2K S 22 Safety...
Page 64: ...R5913197 02 SP2K S 64 Lenses Lens holder...
Page 72: ...R5913197 02 SP2K S 72 ICMP X...
Page 92: ...R5913197 02 SP2K S 92 ICMP X...
Page 100: ...R5913197 02 SP2K S 100 Projector Power Cycle...
Page 106: ...R5913197 02 SP2K S 106 Connectivity...
Page 112: ...R5913197 02 SP2K S 112 1 Image 10 7 Sealed cover fixation Convergence...
Page 120: ...R5913197 02 SP2K S 120 Convergence...
Page 130: ...R5913197 02 SP2K S 130 3 Lift up the cover and remove it reference 2 Projector covers...
Page 144: ...R5913197 02 SP2K S 144 Projector covers...
Page 152: ...R5913197 02 SP2K S 152 List of tools...
Page 156: ...R5913197 02 SP2K S 156 Index...
Page 157: ......