background image

RELEASE 

ER2018_02_

23

This document is property of Euroscreen Srl.

Any distribution, reproduction, copying or publication of this document is prohibited.

INSTALLATION AND

MAINTANANCE MANUAL

PROJECTOR LIFT

SI-H L 300

ORIGINAL INSTRUCTIONS IN ITALIAN LANGUAGE

Translation into English language

Summary of Contents for SI-HL300

Page 1: ...erty of Euroscreen Srl Any distribution reproduction copying or publication of this document is prohibited INSTALLATION AND MAINTANANCE MANUAL PROJECTOR LIFT SI H L 300 ORIGINAL INSTRUCTIONS IN ITALIAN LANGUAGE Translation into English language ...

Page 2: ...THE PROJECTOR LIFT 2 1 General description 2 2 Dimensions of closed projector lift 2 3 Dimensions of open projector lift 2 4 Technical specifications 2 5 Motor specifications 3 0 SAFETY STANDARDS AND RESIDUAL RISKS 3 1 Safety standards 3 2 Description of safety devices 3 3 Residual risks 3 4 Noise generated by the projector lift 4 0 INSTALLATION 4 1 Packaging contents 4 2 Installation L form metal...

Page 3: ...he product The installation manual is composed from 1 0 General information 2 0 Projector lift description 3 0 Safety and residual risks 4 0 Installation 5 0 Out of order 6 0 Check register 1 2 MANUFACTURER S RIGHTS Copyrights of this installation manual are exclusively of EUROSCREEN SRL Via Stiria 45 16 33100 Udine Italy Tel 39 0432 522755 Fax 39 0432 524000 info screenint com www screenint com 1...

Page 4: ...th WARNING This symbol is used in the safety warnings of this installation manual in order to indicate dangerous situations that in case of negligence can cause limited injuries or damages The symbol can also be used to indicate situations that can damage the lift This installation manual is addressed to end user of the product owner people in charge of the product people in charge of disintalling...

Page 5: ... of the faulty part component or part of the product excluding installing dismantling and transport costs of the component or of the entire product 1 7 2 The purchasing company is obliged to inform in written the manufacturer about the fault within 8 days that the product run faulty In case of negligence the warranty is voided In any case the fault or complaint have to be verified by the manufactu...

Page 6: ...f this product and it has to be archived and used during the entire lifetime of the product 1 7 8 In case the lift is passed to a third party it is COMPULSORY that the user hands over to the third party this document and to inform the manufacturer of full name and address of the new owner 1 7 9 The manufacturer reserves the right to modify at any time all the technical documentation and consequent...

Page 7: ...n and maintanance manual Projector lift Mod SI H L 300 This lift is identified by product identification labels that indicate its essential technical specifications 1 8 PRODUCT IDENTIFICATION LABELS 1 8 1 Product identification label n 01 This label reports the following information A Type of lift B Model name of lift C Serial number D Year of manufacturing E Motor power F Operating Frequency G Ph...

Page 8: ...ent is property of Euroscreen Srl Any distribution reproduction copying or publication of this document is prohibited 1 8 2 Warning label n 01 This label reports the following information Near the lift scissors there is danger of cutting and crushing while the lift is operating Position Warning label n 01 ...

Page 9: ...rl Any distribution reproduction copying or publication of this document is prohibited Installation and maintanance manual Projector lift Mod SI H L 300 Position Warning label n 02 1 8 3 Warning label n 02 This label reports the following information A Maximum load allowed projector tile of the false ceiling ...

Page 10: ... users have to be instructed that the use of this machine has to be done conforming to the indications of this installation manual The lift has to be used specifically for what it is purposed that it is indicated inside the installation manual These obligations have to be fulfilled also from forwarders installers maintenance technicians and people in charge for waste of the product each of them re...

Page 11: ...NERAL DESCRIPTION Left structural profile 30x30 mm Fix pulley Ceiling mounting bracket 40x40x60 mm Closing plug for profile 30x30 mm Front structural profile 30x30 mm Braided steel cable covered with PVC Left stabilizing scissors Cable regulator Left structural profile 30x30 mm Plate for fixing the projector Right structural profile 30x30 mm Safety screw Right stabilizing scissors Right structural...

Page 12: ...Srl Any distribution reproduction copying or publication of this document is prohibited The drawings here under 2 2 a 2 2 b indicate maximum dimensions of the closed lift The drawings here under 2 3 a 2 3 b indicate maximum dimensions of the open lift 2 2 a side view Power supply Power supply 2 2 b rear view 2 2 DIMENSIONS OF CLOSED PROJECTOR LIFT 2 3 MECHANICAL SPECIFICATIONS 2 3 a side view 2 3 ...

Page 13: ...8 Kg 570x600 WxD 575x405x554 WxHxD 20x18 WxH 30 Kg 575x3025x554 WxHxD POWER SUPPLY MAXIMUM SIZE FIXING POINTS OF PROJECTOR SECTION OF POWER CABLE WIRE NET WEIGHT OF THE PROJECTOR LIFT FREQUENCY MAXIMUM PROJECTOR DIMENSIONS DIMENSION LIFT CLOSED CABLE GATHERING SYSTEM internal dimensions LENGTH OF POWER CABLE MAXIMUM CAPACITY DIMENSION LIFT OPENED 2 5 MOTOR SPECIFICATIONS GAPOSA MOTOR series XQ50 T...

Page 14: ...NCE OR CLEANING OPERATION OF THE PRODUCT CHECK CAREFULLY THAT THE LIFT IS DISCONNECTED BEFORE ANY OPERATION Do not disassemble any safety device mounted on the product see chapter 3 2 Do not activate the lift if any safety device is dismantled or not properly fixed It is possible to interrupt any operation of the lift by releasing the button of the supplied up down switcher In case of failure or m...

Page 15: ...pped with two safety screws fixed one onto the bottom left profile and one onto the bottom right profile The safety screws are fixed in a specific position so that in case one or both steel cables break the stabilizing scissors will stop at the adjusted end stop 3 2 DESCRIPTION OF SAFETY DEVICES WARNING After having set the bottom end stop FIX TIGHTLY WITH PROPER ALLEN KEY both safety screws at a ...

Page 16: ...he use of the lift please take care of areas that have residual risks for people or objects in case of incorrect use or evaluation error or inattention eluding the norms specified in this installation manual and indications on product identification labels The drawing here under identifies the residual risk area above the plate for fixing the projector Minimum height H 2 50 ml without ceiling tile...

Page 17: ...2 Other residual risks Do not lift up or down people or animals On the lift have to be installed videoprojectors only Do not mount more load under the lift than the maximum load specified on the warning label n 02 see 1 8 3 Do not leave free flying cables near the stabilizing scissors in order to avoid cutting or damages on them 3 4 NOISE GENERATED BY THE PROJECTOR LIFT 3 4 1 Warnings The indicate...

Page 18: ...is document is prohibited User has to pay attention also to other factors that can influence the noise level of the product Among the others two of these factors are correct installation and careful maintenance of the lift In case of continuous unusual noises and vibrations the lift is probably damaged In this case do not use the lift and proceed with an accurate and complete maintenance ...

Page 19: ...you open the packaging please CHECK that it contains ALL the components below In case one or more components are missing please refer to the dealer you purchased the product from 4 1 PACKAGING CONTENTS 4 0 INSTALLATION pcs 01 Packaging carton box COMPONENTS OF THE PACKAGING CARTON BOX PLEASE STORE UP THE ORIGINAL CARTON BOX Box lid Polystyrene sheet Projector lift Polystyrene edges Box bottom Ades...

Page 20: ...04 Sliding brackets to support the false ceiling plate pcs 04 Threaded bars M6x25 cm for fixing the ceiling cover plate pcs 12 Nuts M6 for mounting the threaded bars to the sliding brackets pcs 4 Blind screws M6 ø8 L1 Bushes M6 ø10 L2 pcs 4 Hex head screws M6x10 pcs 04 L form metal brackets for ceiling mounting with 8 screws and 8 washers pcs 01 Up down switcher pcs 01 Installation and maintenance...

Page 21: ...s shown below 4 2 INSTALLATION L FORM METAL CEILING MOUNTING BRACKETS Inside each upper right and left structural pro file there are four nuts to screw the screws to the L form metal brackets The drawing below indicates the recommended position where to mount the L form metal brackets In this installation manual we suppose an installation to a flat and horizontal ceiling made of concrete Till the ...

Page 22: ...s in the most accurate way The ceiling has to be clean and flat Installing the lift perfectly levelled is IMPORTANT and ensures silent movement of the lift without any shaking jolting or friction that would compromise the alignment between projector and projection screen INSTALLATION OF THIS LIFT HAS TO BE CARRIED OUT FROM AT LEAST TWO QUALIFIED PERSONS Measure centre hole of the brackets as accur...

Page 23: ...e lift structure in order to keep tension onto the steel cables lift up the lift using proper safety devices aligning the brackets with the drilled holes Mount the lift to the ceiling using the suitable bolts screws and plugs NOT SUPPLIED suitable for the kind of ceiling and the weight that have to be supported max ø8 After having fixed the lift to the ceiling please remove the polystyrene cubes f...

Page 24: ... desired height in order to fix the video projector with suitable screws NOT supplied Pleasetakecarethattheprojector s centre of gravity is located in the middle of the plate In order to define the ideal position of the projector please use a sprit level 4 4 MOUNTING OF THE VIDEOPROJECTOR All the power and signal cables have to be stored inside the cable management system WARNING Use flexible cabl...

Page 25: ...300 IT IS ABSOLUTELY FORBIDDEN TO POSITION THE POWER CABLE OF THE LIFT IN THE RESIDUAL RISK AREA OF THE LIFT AS SHOWN IN THE DRAWING HERE AT THE RIGHT SIDE OTHERWISE THE CABLE CAN BE CUT DURING OPERATION OF THE LIFT Projector power and signal cable inside cable management system MOTOR AND PROJECTOR CABLES DO NOT HAVE TO INTERFERE NEITHER WITH MOTOR TUBE NOR WITH STEEL CABLES COVERED WITH PVC Motor...

Page 26: ...sing screwdrivers remove the up down buttons Fig 2 Turn the upper tile of the switcher in order to remove it from the bottom tile The up down switcher supplied gives the possibility to be fixed to the wall in two different ways with the bottom tile A or without the bottom tile B 4 5 1 Parts of the up down switcher included in the box Bottom tile of the switcher Upper tile with electric fruit Fixin...

Page 27: ...that the mains tension is the same as the one indicated on the product identification label n 01 see 1 8 1 It is compulsory to connect the electrical connection of the lift also to earth 4 5 5 Any operation that will involve electrical components has to be carried out by qualified personnel only always following the procedure here under 1 SWITCH OFF THE MACHINE 2 DISCONNECT THE MAINS BY THE GENERA...

Page 28: ...wed to lower the closed stop position Do not try to high the upper end stop because this will cause severe damages to the product and invalidate warranty on the lift Turn the screw on the motor shown on the picture clockwise to lower the lift Turn the screw on the motor as shown on the picture anticlockwise to increase the bottom stop point and clockwise to reduce it 4 6 1 In order to fix the UPPE...

Page 29: ...XING THE FALSE CEILING TILE 4 7 1 The supplied components allow to install the lift inside a false ceiling Components to fix the false ceiling plate are listed in chapter 4 1 Fig D E F L1 and L2 These components are suitable to fix a false ceiling plate under the projector in order to hide the lift inside a false ceiling THE FALSE CEILING PLATE IS NOT SUPPLIED WITH THE LIFT THE MAXIMUM WEIGHT OF T...

Page 30: ...ing or publication of this document is prohibited Sliding brackets to support the false ceiling plate Hex head screws M6x10 Threaded bars M6x25cm Nuts M6 4 7 2 Mounting The following drawings explain how to mount the components above mentioned Inside the right and left lower structural profile there are two nuts to be used to screw the screws fig 02 in order to use the sliding brackets fig 01 Blin...

Page 31: ...oint in order to fix correctly the false ceiling plate After fixing the threaded bars fig 04 and defined the right length the false ceiling plate can be mounted using two types of screws The following drawings describe the two types of installation Drill the hole in the plate fit in the bush from the bottom side and screw the threaded bar to it Drill a partial hole at the top side of the plate and...

Page 32: ... it it is necessary to divide the plastic parts from the electrical components in order to waste them properly following the recycling norms As regards the mechanic parts of the lift it is suggested to divide steel parts from other metals or alloys parts so that they can be sent for a proper recycling process Dismantling the lift please pay attention to all heavy metal parts in order to avoid crus...

Page 33: ...ift and projection screen if this is the configuration operate in different times not at the same time and that while the first one is operating the other one is not in power switcher has to be a deadman switcher or domotic system that works with this logic Check steel cables covered by black PVC no steel wires have to be visible outside the black PVC scabbard Check of the ceiling fixing brackets ...

Page 34: ... g m m a y a y Firma Signature Firma Signature DATA DATE DATA DATE Osservazioni Notes Osservazioni Notes Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result g g m m a y a y Installation and maintanance manual Projector lift Mod SI H L 300 This document is property of Euroscreen Srl Any distribution reproduction copying or publ...

Page 35: ...ult Esito positivo Positive result Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result g g g g m m m m a y a y a y a y This document is property of Euroscreen Srl Any distribution reproduction copying or publication of this document is prohibited Installation and ma...

Page 36: ...o positivo Positive result Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result g g g g m m m m a y a y a y a y Installation and maintanance manual Projector lift Mod SI H L 300 This document is property of Euroscreen Srl Any distribution reproduction copying or publ...

Page 37: ...o positivo Positive result Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result g g g g m m m m a y a y a y a y This document is property of Euroscreen Srl Any distribution reproduction copying or publication of this document is prohibited Installation and maintananc...

Page 38: ...o positivo Positive result Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result g g g g m m m m a y a y a y a y Installation and maintanance manual Projector lift Mod SI H L 300 This document is property of Euroscreen Srl Any distribution reproduction copying or publ...

Page 39: ...o positivo Positive result Esito positivo Positive result Esito positivo Positive result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result Esito negativo Negative result g g g g m m m m a y a y a y a y This document is property of Euroscreen Srl Any distribution reproduction copying or publication of this document is prohibited Installation and maintananc...

Reviews: