![background image](http://html1.mh-extra.com/html/barco/sp2k-s/sp2k-s_installation-manual_4254171070.webp)
R5913197 /02 SP2K-S
70
LEDs and inputs on the ICP-D
1
2
3
5
4
Image 6–3
1
HDMI Input A
2
HDMI Input B
3
Reset button
4
Ready LED
5
Power & Error LED
For the specifications on the HDMI ports, please refer to the appendices of the ICP-D installation manual.
ICP-D LEDs
Status overview PWR/ERROR and READY LEDs:
PWR/ERROR
READY
ICP-D Status
Off
Off
Turned off
Red
Off
Board reset or security error
Blinking Green
Off
Boot loader
Blinking Green
Blinking Orange
Operating System start up
Blinking Green
Orange
Security Manager - Image Integrity tests
Blinking Green
Blinking Yellow
Security Manager - Self Test
Green
Blinking Green
Starting Applications
Green
Green
Applications started in normal mode
Green
Orange
Applications started in degraded mode
Blinking Red
Off
Security error
Green
Blinking Orange
Update ongoing
Orange
Orange
Update done
When installing a new ICP board in a SP2K-S projector the Spatial Color Calibration file must be
reloaded and activated.
CAUTION:
Make sure not to short circuit the battery on the board. That will destroy the board
completely !
Summary of Contents for SP2K-S
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP2K S...
Page 4: ......
Page 8: ...R5913197 02 SP2K S 8...
Page 22: ...R5913197 02 SP2K S 22 Safety...
Page 64: ...R5913197 02 SP2K S 64 Lenses Lens holder...
Page 72: ...R5913197 02 SP2K S 72 ICMP X...
Page 92: ...R5913197 02 SP2K S 92 ICMP X...
Page 100: ...R5913197 02 SP2K S 100 Projector Power Cycle...
Page 106: ...R5913197 02 SP2K S 106 Connectivity...
Page 112: ...R5913197 02 SP2K S 112 1 Image 10 7 Sealed cover fixation Convergence...
Page 120: ...R5913197 02 SP2K S 120 Convergence...
Page 130: ...R5913197 02 SP2K S 130 3 Lift up the cover and remove it reference 2 Projector covers...
Page 144: ...R5913197 02 SP2K S 144 Projector covers...
Page 152: ...R5913197 02 SP2K S 152 List of tools...
Page 156: ...R5913197 02 SP2K S 156 Index...
Page 157: ......