3. Physical installation
Ensure good condition of the lamp house blower. Keep the blower inlet clean for unrestricted air
fl
ow.
To ensure maximum lamp life, operate the lamp house blower and the exhaust system for at least ten minutes
after extinguishing the lamp.
Optional electrical connection of the fan to the projector
The exhaust fan may electrically be connected with the projector. When that is done, the blower starts working when the lamp is
switched on and stops working after the cool period is completed.
The power socket is located next to exhaust output and may only be used to connect the external exhaust fan. No connection with
other devices is allowed.
The exhaust outlet delivers maximum 3A, 200-240V at 50-60Hz.
The external fan power cord shall be not less than 0.75 mm² or AWG 18.
Image 3-6
Fan power connection
22
R59770495 DP2K-23B 30/04/2010
Summary of Contents for DP2K-23B
Page 1: ...DP2K 23B Installation manual R59770495 00 30 04 2010...
Page 6: ......
Page 37: ...4 Lamp lamp house Image 4 5 Remove lamp house R59770495 DP2K 23B 30 04 2010 31...
Page 47: ...4 Lamp lamp house 4 Reinstall the lamp cover of the projector R59770495 DP2K 23B 30 04 2010 41...
Page 78: ...7 Communicator Touch Panel 72 R59770495 DP2K 23B 30 04 2010...
Page 82: ...8 Starting up 76 R59770495 DP2K 23B 30 04 2010...
Page 90: ...9 Projector registration Image 9 9 Add new owner 84 R59770495 DP2K 23B 30 04 2010...
Page 110: ...10 Removal and installation of the projector covers 104 R59770495 DP2K 23B 30 04 2010...