2.4.1.4.MAINTENANCE
2.4.1.4.1. Daily tasks.
2.4.1.4.1.1.- Steps to follow by switching on the wrapping machine.
•
Heat up the slot nozzle until it reaches the working temperature.
•
Using a gauge sheet of 0.4 mm thickness, clean the slot (13) shifting the
sheet softly taking care not to damage the gauges nor the slot. If this
happens there is a risk of leak or marks in the application.
•
Perform a scan with the two gauges shifting them between the minimum
of 12,5 and the maximum.
•
Place the gauges in the wished application width.
•
Pump glue until it comes out fluidly.
•
Clean with solvent the head zone that is in contact with the foil until it is
perfectly clean.
NOTA
IN CASE OF NON-STOP PRODUCTION YOU HAVE TO PERFORM THIS
OPERATION AT LEAST ONE TIME PER DAY
13
Summary of Contents for 18248
Page 1: ...CUSTOMER BAHRAIN ALUMINUN KITCHEN MACHINE Mod PUR 33 L MACHINE Nº 18248 ...
Page 6: ......
Page 39: ...4 Technical features drawings and schemes 4 1 Technical features ...
Page 40: ...4 2 Drawings ...
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ...IMPREGNATION STATION 18248 5 Cod 222 399 Cod 222 398 TUBE Cod 8 023 ...
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ...BLOW CLEANING UNIT 18248 16 Cod 114 646 Cod 7 562 Cod 114 647 Pieces Cod 114 648 ...
Page 68: ...TURBINE Cod 270 732 18248 17 Cod 313 453 Cod 182 059 Cod 46 930 Cod 269 341 ...
Page 69: ...18248 18 Cod 381 232 Cod 384 743 POWER PACKS AND IONIZING BAR ...
Page 71: ...4 3 Pneumatic schemes ...
Page 72: ......
Page 73: ...4 4 Electric schemes ...