Baker Double Notcher - Rev 2, 09/07
;
WWW.BAKER-ONLINE.COM
17
Adjusting for Material Length
The hopper guide rails are held in place by two (2) mounting bolts, one on each end of the
guides – four (4) total.
To adjust, loosen and remove the bolts.
For longer material, move the guide rails outward or away from the cutter heads.
For shorter material move the guide rails inward or toward the cutter heads.
Once the desired setting has been made, secure the guide rails by inserting the mounting
bolts and re-tightening them.
Note:
The guide rails should be set close to the edge of the material, but not disrupt material
flow or create resistance.
Weight Bars
Hopper Guide
Rails
Figure 17