REPAIR/REPLACEMENT PROCEDURES
FUSE REPLACEMENT PROCEDURES
4 - 2
I-E96-411A
®
9. Insert the replacement IDO module until it locks securely
into place.
10. Install (snap on) the front cover on the replacement IDO
module.
11. Apply power to the cabinet containing the replacement IDO
module.
FUSE REPLACEMENT PROCEDURES
If the fuse opens, replace it with a new one. To replace a fuse:
1. Turn off power to the cabinet containing the IDO module.
2. Remove (pull off) the front cover of the IDO module.
3. Pull the IDO module out far enough to gain access to fuse
clip F1.
4. Remove the faulty fuse.
5. Install the replacement fuse into fuse clip F1.
6. Insert the IDO module until it locks securely into place.
7. Install (snap on) the front cover of the IDO module.
8. Apply power to the cabinet containing the IDO module.
CAUTION
It is strongly recommended that all power (cabinet, I/O, etc.) be
turned off before doing any termination module wiring. Failure
to do so could result in equipment damage. Do not apply
power until all connections are verified.
ATTENTION
Il est fortement recommandque toutes les alimentations (arm-
oire, E/S, etc.) soient coupèes avant d'effectuer quelque rac-
cord que ce soit sur un carte de raccordement. Un
manquement à ces instructions pourrait causer des dommage
à l'equipement. Ne pas rebrancher les alimentations avant
d'avoir vèrifiè tous les raccordements.