INSTALLATION
UNPACKING AND INSPECTION
3 - 2
I-E96-117B
®
UNPACKING AND INSPECTION
The SAC station is carefully packed to protect it during ship-
ping. Read the following information about handling before
inspecting the SAC station.
1. Examine the hardware immediately to verify that it has not
been damaged in transit.
2. Notify the nearest Bailey Controls sales office of any such
damage.
3. File a claim for any damage with the transportation com-
pany that handled the shipment.
4. Use the original packing material and container to store the
hardware.
5. Store the hardware in an environment of good air quality,
free from temperature and moisture extremes.
SELECTING OPTIONS
There are four dipswitches and three jumpers on the SAC sta-
tion circuit board that must be configured before placing the
station into operation. Set all option dipswitches so that the
station operates properly within the process control strategy.
Figure
shows the location of the option dipswitches and
Figure 3-1. Dipswitch and Jumper Locations on the SAC Station Circuit Board
P3
P6
P2
S3
S4
JP1
JP2
JP3
P5
F1
P1
S1
S2
T00296A
1 2 3
1 2 3
1
2
3
1 2
OPEN
3
1 2
OPEN
3
OPEN
1 2 3 4 5 6 7 8
OPEN
1 2 3 4 5 6 7 8