29
29
Changeover from a Jointer to a Planer
Disconnect and lockout power to the machine!
1.
Loosen the fence clamping levers
2.
(A) about two turns and lift the
fence assembly off of the table and
store out of the way.
Position and secure the bridge
3.
guard/guide (B) so that it extends
over the entire table.
Unlock the outfeed table lock lever
4.
(C) by pulling forward and outward,
left as shown, to unlock the outfeed
table.
Lift the outfeed table to the open
5.
position until the lock pin (D)
engages to lock the table.
Unlock the infeed table lock lever
6.
(E) by pulling forward and outward, right as shown,
to unlock the infeed table.
Lift the infeed table to the open position until the
7.
lock pin (F) engages to lock the table.
Rotate the hood (G) upward to cover and guard the
8.
cutter head and latch into position using the hood
latch (H).
Routing the dust collection hose as needed to be
9.
clear of the planer table outfeed and the operator
and connect to the planer hood (G). Verify that the
dust hose does not block the planer outfeed table
or interfere with the operator’s movement.
The machine is ready for planer operation.
10.
E
A
B
C
D
H
G
F
Summary of Contents for JP-1250
Page 24: ...21 21 ELECTRICAL DIAGRAM Connection Diagram ...
Page 49: ...46 46 CABINET PARTS DIAGRAM ...
Page 51: ...48 48 JOINTER TABLE PARTS DIAGRAM ...
Page 53: ...50 50 CUTTER HEAD AND FEED ROLLER PARTS DIAGRAM ...
Page 55: ...52 52 FEED ROLLER DRIVE PARTS DIAGRAM ...
Page 57: ...54 54 PLANER TABLE PARTS DIAGRAM ...
Page 61: ...58 58 FENCE PARTS DIAGRAM ...
Page 63: ...60 60 NOTES ...