19
SQUARE
EDGE
Install the left panel 1-1/2"
from the top plate.
Use a 2x3 spacer for
consistent measurement.
Secure panel with 2" nails
spaced 6" apart
on edges.
Install the right panel
fl ush to installed panel,
as shown.
Ensure 64" (162,8 cm)
door measurement.
Use part
OO
as a
temporary brace.
Secure with (2) 3"
screws.
Secure panels with 2"
nails spaced 6" apart
on edges.
2x3
2x3
2x3
PARTS REQUIRED:
GABLE WALL 01 WITH DOOR
2" (5,1 cm)
x166
x1
x1
6"
(15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush
Flush
OO
Temporary Brace
3" (7,6 cm)
x2
4
3
64"
(162,6 cm)
3"
(7,6 cm)
Screw
3"
(7,6 cm)
Screw
3/4"
(1,9 cm)
x1
69" (75,3 cm) Door Stiffener
OO
Temporary Brace
Install (2)
11-7/8" x 84"
panels fl ush to installed
panels and 1-1/2" from
the top plate.
Secure panels with 2"
nails spaced 6" apart
on edges.
Note the panel
lip-edge/square edge
orientation.
Flush
Flush
Flush
Flush
5
Your 12' gable wall 01 with
door is now assembled.
Carefully fl ip the wall over.
FINISH
23-7/8"
(60,6 cm)
SQUARE
EDGE
23-7/8 x 84"
(
60,6 x 213,4 cm)
x2
1-1/2"
(3,8 cm)
6"
(15,2 cm)
3/4" Gauge
Block
3/4" Gauge
Block
Flush