12' x 20' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x84
PARTS REQUIRED:
PARTS REQUIRED:
1
BEGIN
Orient parts on top of wall frames.
Measure and mark from end of boards.
Secure from top with (2) 3" nails
spaced every 24"
(Fig. A).
Fig. A
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
2 x 4 x 48" (5
,1 x
10,2 x 121,9 cm)
SP
x2
2 x 4 x 44-3/8" (5
,1 x
10,2 x 112,7 cm)
HVC
x4
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
PT
DOOR
Ensure all doubler seams are non-aligned
over seams of wall top plates.
SP
SP
TJ
PT
PT
PT
PT
3" (7,6) cm
Nails
TJ
HVC
HVC
Nail TYP.
24"
(61 cm)
Your wall doublers are now installed.
FINISH
CONTINUE TO PAGE 79 TO RESUME
CONSTRUCTION OF 12' X 20' SHED.
x2
2
Secure from bottom with (2) 3" screws
at each corner
(Fig. B).
Fig. B
3" (7,6) cm
Screws
3" (7,6 cm)
x8