63
3"
(7,6 cm)
Screws
PARTS REQUIRED:
2nd 16' EAVE WALL (07 or 08) INSTALLATION
Secure wall with (1) 2" screw through
gable wall panel into 12' wall bottom
and top plates
(Fig. A, Fig. B)
.
Secure wall to bottom plate fi rst.
ENSURE PANEL CORNERS ARE FLUSH.
2
2" (5,1 cm)
x2
Flush
2" (5,1 cm)
Screw
Fig. B
2"
(5,1 cm)
Screw
Fig. A
Place 2nd 16' wall centered on fl oor.
The
1-1/2" (3,8 cm) overlap is to the top.
Use
TJ
as a temporary brace as shown.
Secure
TJ
with (2) 3" screws.
TJ
x1
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
1-1/2"
(3,8 cm)
3" (7,6 cm)
x2
3" (7,6 cm)
x16
2" (5,1 cm)
x36
3
Nail lower edge of wall panels to fl oor
frame with 2" nails spaced 6" apart.
Angle nails into fl oor frame
(Fig. C)
.
Secure wall bottom plates to fl oor
with 3" nails
(Fig. C)
.
BEGIN
1
Nail 2" nails fi rst.
2"
(5,1 cm)
Nails
Fig. C
3"
(7,6 cm)
Nails
3" (7,6 cm)
Nails
6"
(15,2 cm)