78
44-3/8"
92-5/8"
48"
96"
(112,7 cm)
(235,3 cm)
44-3/8"
92-5/8"
(112,7 cm)
(235,3 cm)
(121,9 cm)
48"
(121,9 cm)
(243,8 cm)
96"
(243,8 cm)
48"
96"
(121,9 cm)
48"
(121,9 cm)
(243,8 cm)
96"
(243,8 cm)
DOOR
HVC
Nail TYP.
24"
(61 cm)
12' x 24' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x84
PARTS REQUIRED:
PARTS REQUIRED:
1
BEGIN
Orient parts on top of wall frames.
Measure and mark from end of boards.
Secure from top with (2) 3" nails
spaced every 24"
(Fig. A).
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
x2
2 x 4 x 44-3/8" (5
,1 x
10,2 x 112,7 cm)
HVC
x4
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
PT
Ensure all doubler seams are non-aligned
over seams of wall top plates.
SP
SP
SP
SP
TJ
PT
PT
PT
PT
Fig. A
Fig. B
3" (7,6) cm
Nails
3" (7,6) cm
Screws
TJ
HVC
HVC
Nail TYP.
24"
(61 cm)
Your wall doublers are now installed.
FINISH
CONTINUE TO NEXT PAGE TO RESUME
CONSTRUCTION OF 12' X 24' SHED.
2 x 4 x 48" (5
,1 x
10,2 x 121,9 cm)
SP
x4
3" (7,6 cm)
x8
2
Secure from bottom with (2) 3" screws
at each corner
(Fig. B).