60
44-3/8"
92-5/8"
48"
96"
(112,7 cm)
(235,3 cm)
44-3/8"
92-5/8"
(112,7 cm)
(235,3 cm)
(121,9 cm)
(243,8 cm)
48"
96"
(121,9 cm)
(243,8 cm)
12' x 12' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x64
PARTS REQUIRED:
Your wall doublers are now installed.
FINISH
Fig. A
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
x2
2 x 4 x 48" (5
,1 x
10,2 x 121,9 cm)
SP
x2
2 x 4 x 44-3/8" (5
,1 x
10,2 x 112,7 cm)
HVC
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
PT
DOOR
Ensure all doubler seams are non-aligned
over seams of wall top plates.
HVC
TJ
TJ
SP
PT
SP
PT
3" (7,6) cm
Nails
HVC
CONTINUE TO PAGE 79 TO RESUME
CONSTRUCTION OF 12' X 12' SHED.
1
BEGIN
Orient parts on top of wall frames. Measure and mark from end of boards.
Secure from top with (2) 3" nails spaced every 24"
(Fig. A).
2
Secure from bottom with (2) 3" screws at each corner
(Fig. B).
Fig. B
3" (7,6) cm
Screws
3" (7,6 cm)
x8
Nail TYP.
24"
(61 cm)