58
PARTS REQUIRED:
2nd 12' EAVE WALL 04 INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x12
2" (5,1 cm)
x27
4
Nail 12' eave wall panel to 12' gable wall
stud with 1-1/2" nails spaced 6" apart.
Your 2nd 12' eave wall 04 is now installed.
FINISH
3"
(7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown
(Fig. D)
.
5
3
Nail lower edge of wall panels
to fl oor frame with 2" nails
spaced 6" apart.
Angle nails into fl oor frame
(Fig. C)
.
Secure wall bottom plates to fl oor
with 3" nails
(Fig. C)
.
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
3"
(7,6 cm)
Screw
Fig. D
6"
(15,2 cm)
Secure wall with (1) 2" screw through
eave wall panel into 12' gable wall
bottom and top plates
(Fig. B, Fig. A)
.
Secure wall to bottom plate fi rst.
ENSURE PANEL CORNERS ARE FLUSH.
2
BEGIN
1
Place 2nd 12' eave wall centered on fl oor
1-1/2" (3,8 cm) overlap is to the top.
Nail 2" nails fi rst.
2"
(5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. C
Flush
2"
(5,1 cm)
Screw
Fig. B
Fig. A
2"
(5,1 cm)
Screw
1-1/2"
(3,8 cm)
2" (5,1 cm)
x2