66
44-3/8"
92-5/8"
48"
96"
(112,7 cm)
(235,3 cm)
44-3/8"
92-5/8"
(112,7 cm)
(235,3 cm)
(121,9 cm)
48"
(121,9 cm)
(243,8 cm)
48"
96"
(121,9 cm)
48"
(121,9 cm)
(243,8 cm)
12' x 16' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x76
PARTS REQUIRED:
1
BEGIN
Orient parts on top of wall frames. Measure and mark from end of boards.
Secure from top with (2) 3" nails spaced every 24"
(Fig. A).
2
Secure from bottom with (2) 3" screws at each corner
(Fig. B).
Fig. B
3" (7,6) cm
Screws
Fig. A
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
2 x 4 x 48" (5
,1 x
10,2 x 121,9 cm)
NK
x2
2 x 4 x 44-3/8" (5
,1 x
10,2 x 112,7 cm)
HVC
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
PT
DOOR
Ensure all doubler seams are non-aligned
over seams of wall top plates.
SP
SP
SP
SP
TJ
PT
PT
3" (7,6) cm
Nails
TJ
HVC
HVC
Nail TYP.
24"
(61 cm)
Your wall doublers are now installed.
FINISH
CONTINUE TO PAGE 79 TO RESUME
CONSTRUCTION OF 12' X 16' SHED.
x4
3" (7,6 cm)
x8