V-Series Dobby Loom User’s Manual
Loom Assembly
Install Harnesses
Page | 31
and tape. Do not unwrap it until the unit is in place and ready to
secure.
2)
From your hardware pack, select four 1/4” x 5-1/2” Flat Head
Machine Screws and 1/4” Square Nuts.
3)
Orient the Harness Pulley Support Assembly on the top horizontals,
#10 and #15, so that the end with the two rows of pulleys is at the
right side of the loom and the small plaque with your loom’s serial
number faces the front of the loom. It should overhang about 4” on
the right side.
Figure 23 - Harness Pulley Support Assembly
4)
Align the four mounting holes in the Pulley Supports with those in
the Top Horizontals.
Figure 24 - Left Harness Pulley
Holes
Figure 25 - Right Harness
Pulley Holes
Note:
If you are not able to align the holes without removing the packing strips, take
extra caution to move the Horizontals into place without pulling them apart.
5)
Cut and carefully remove any remaining packing tape.