V-Series Dobby Loom User’s Manual
Loom Assembly
Connecting the Frames
Page | 22
4)
Hold the beam with the Handle Assembly on the right side, gently
ease the two Side Frames apart and slip both ends of the Beam into
their mounting holes.
Note:
The handle will rest on the small block installed in the Right Side Frame.
Figure 13 - Cloth Storage Handle on Block
5)
Screw the handle assembly into place, in the pre-drilled hole on the
loom and tighten securely. Be sure to hold the Cloth Storage Pawl
out of the way, when installing the Beam.
6)
Push the side frames together to hold the beam in place.
CAUTION:
Until the Lower Front Assembly is installed, take care not to dislodge the
Beam! You may want to rope the two sides together near the Cloth Storage
Beam to lend more stability.