EN
14
C - INSTALLATION
3 - INSTALLING THE SWITCHGEAR
The switchgear must be mounted to the post where the 230Vac power comes from.
•
To ensure proper operation of the motorisation, the length of the actuator cables must not exceed 8 m per
actuator. Therefore, the switchgear must be mounted less than 6 m from each actuator.
•
Use two screws to install and mount the switchgear in the defined location.
STEP 4:
Keep only the mount and fix it to the gate
using the appropriate fasteners
STEP 5:
Use the butterfly screw to reattach the
actuator on the mount
CONNECTED MOTOR DRIVE KIT WITH ACTUATORS