
System Handover
Checklist - Page 34
Installation & Maintenance
System Handover - Page 34
INDeX 30
38DHB0002UKDF- Issue 4 (07/2001)
System Handover
Checklist
Equipment :
– Have all extensions been tested?
– Have all exchange lines been tested?
– If fitted has the modem been tested?
– Is system programming in line with the customer specification?
– Has the appropriate country file (default is English/UK) been uploaded (see
"Initial Programming" on page 22)
– Have the INDeX database backup disks been made and left on site?
– Has the mains supply (and any UPS if fitted) been tested?
– Have any peripheral systems been tested (e.g. WOC, NOC, Voice Mail)?
Wiring :
– Is the distribution wiring satisfactory to the required national standards?
– Are all wires and cables clearly labelled.
– Is the site clean and tidy with all rubbish removed?
Documentation :
– Have the system documents, MDF site records and floor plans been completed?
Information :
– Have the handset user guides been issued to the user.
– Has the customer been made aware of the telephone number for
maintenance/fault reports.